Field plans for dadsOne page per plan · Friday letter

Home / Camping and trail skills with kids

Rig a tarp ridgeline

A ridgeline supports the high fold of a tarp between two anchors. Practice low enough to reach from the ground. Tie a fixed loop at one end and a tensioning hitch at the other, then attach the tarp using its maker's instructions.

Follow @dadfieldmanual

Grab first

Before you start

The steps

  1. Choose a low practice span

    Use two permitted posts. Keep the line within reach from the ground and leave space below it to spread the tarp without blocking a path.

  2. Tie the first end

    Take the rope around the first post and tie a bowline: form a small loop, take the end through it, around the standing part, then back through the small loop. Snug it.

  3. Make the tensioning loop

    Toward the second post, make an overhand slip loop in the rope's long standing part. This is the temporary loop used for the trucker's hitch, not the anchor loop.

  4. Tension and finish

    Take the free end around the second post, through the temporary loop, and pull gently. Hold the tension and tie two half hitches with the free end around the line below the loop. Do not crank it tight with tools.

  5. Add the tarp and take it down

    Drape or attach the tarp according to its instructions. Check that its ties and the ridgeline do not cross a walking route. When finished, remove the tarp, release the tension and untie the line.

Common mistakes

Practice together

Dad points to the fixed loop and the tensioning loop while the kid traces the free end on the ground. Swap jobs before hanging the tarp. If the knot is hard to identify, remove the tension and compare it with the source animation.

Sources

More skills to try · Build a weekend by age and time

The Friday letter

Get one weekend plan every Friday

One printable plan for the weekend, one quick plan for a weeknight. The first letter hasn't gone out yet.

Never sold. One-click unsubscribe. See a sample issue · Privacy